Load-Bearing Wall Removal in Ledyard, CT: 44 ft Opening, Independent Beam Review and PE Stamp
Independent review and stamped calculations for a rear addition where 44 ft of first-floor bearing wall came out in two spans on a four-ply 20 in LVL, plus a sealed revision when the framing changed.